New Member FAQ
Kannada Calendar 2012
Karnataka SSLC Results 2012
Forum
Resources
Entrance Exams
Question Bank
Need Help ?
|
Posting Guidelines
|
Members
|
Revenue Sharing
|
behavioral targeting
Awards & Gifts
Karnataka Education
Karnataka Admissions 2012
Karnataka Exam Results
Karnataka Colleges
Resources
»
Articles and Knowledge sharing
»
Others
Energy Crisis / Power Problem / Load Shedding in Karnataka
Posted Date:
10-Aug-2011
Category:
Others
Rating:
Author:
Amaresh
Member Level:
Gold
Points
: 12 (
Rs
5)
Worried about power cut/load shedding? Do you know the reasons behind power cut/load shedding/ in Karnataka? In this article you fill find information regarding load shedding/power problem in Karnataka.
behavioral targeting
There are 5 Electricity Distribution Companies and 1 Electricity Transmission Company.
Transmission Company – KPTCL
State Electricity Distribution Companies :-
1.Bangalore Elctricity Supply Company (BESCOM)
2.Chamundeshwari Electricity Supply Corporation (CESC)
3.Mangalore Electricity Supply Company (MESCOM)
4.Gulbarga Electricity Supply Company (GESCOM)
5.Hubli Electricity Supply Company. (HESCOM)
Refer URL for function of Transmitting and Distribution Companies in detail.
http://www.karnatakaspider.com/resources/3889-Structure-Power-Sector-Karnataka.aspx
Why Load Shedding:-
Presently the Approximate Power Generation of Karnataka from all sources (Govt and Private sector including Central Government) Hydro Power Generation, Thermal Power Generation, Wind Power Generation, gas and diesel Generation etc ) – is 8000MW during peak hours
But the demand is about 10000 MW during peak hours(6 AM to 10 AM & 6PM to 10 PM). And demand is not a constant parameter. It will vary drastically.
It is clear that there is a gap between Supply (Generation) and Demand.
As demand is drastically variable its very difficult to match the demand with supply (generation).
Because of this Distribution companies go for load staggering.
The question may rise in in your mind that why Government is not going for putting up new power plants to match the demand.
Answer for this question is
1.Lack of resources for putting Hydro Power Plants. (All water resources are already in use)
2.To put a Nuclear power plant, still there is no power to state Governments because of security & safety aspects. (Central Government has not given power to state governments)
3. Left one is Thermal Power plants. Peoples /Public who are concerned about environment/ecological system of the globe are opposing to put thermal as well Nuclear power plants. (As it will hamper the environment/ecological system and also it will become one of the reason for increasing Global Warming )
Non availability of proper land/resources for putting Thermal Power Plants.
4.One of the option is that going for Non-Conventional resources i.e. Wind Power Generation, Solar Power Generation. But Non-Conventional resources will help in only reducing little bit of gap between Supply (Generation) and Demand.
From the above points it is clear that Government /Distribution cant go for new Generation as there is no provisions for Generation. (Still Government is trying to put power plants)
Option:-
One option to match the Supply (Generation) and Demand is for Distributing companies is procure the more power from other states by paying higher price and distribute the power in Karnataka state.
Now distributing companies are doing the same, but it is hampering the revenue system of distribution companies, as distributing companies are buying power from other states/private sector power generator at higher prices at sell to public at lower prices. Some times distributing companies are paying Rs.16-18 per unit during peak hour in summer seasons.
The price of electricity will vary from time to time. (Based on season, day, weekend, occasion etc)
And also distributing companies are suffering from loss of revenue, power theft (Commercial Loss), technical loss.
Loss of revenue is because of Unauthorised Irrigation Pump sets / unauthorised domestic connection coming under rural sector. (As Government of Karnataka announced free supply for BPL peoples and to former having Irrigation pump sets up to 10HP)
Government of Karnataka is paying subsidy for the supply which comes under free supply scheme (for authorised connection only).
What is solution :-
Finally distribution companies come up with new concept that is Demand Side Management.
Demand side Management is the tool to match gap between Supply (Generation) and demand with available power supply. That is balance the load with available power supply by efficient load management and energy conservation.
Load staggering is on of the point of Demand Side Management.
"1 Unit Energy saved is 1 Unit Energy gained"
Public/people of Karnataka can come out from this problem by supporting distributing companies in conserving energy and adopting energy saving techniques.
Some of the Energy saving techniques in home/office
Refer URL for saving techniques in home/office
http://www.karnatakaspider.com/resources/3927-Energy-saving-Tips-Home-Office.aspx
Some of the Energy saving techniques in Industrial/IP Sets/Commercial Sector.
1.Using of Energy Efficient Motors/Pumps.
2.Using of Shunt capacitor banks with all type of Induction motors/IP sets. Capacitor banks compensate the reactive power of the power system and helps in energy conservation.
I hope this articles will helps in understanding of power problem in Karnataka and also useful in Conserving the Energy.
"Conserve Energy Save Planet"
Did you like this resource? Share it with your friends and show your love!
Tweet
Share
Read related articles:
Karnataka Energy Crisis
Karnataka political issues
Responses to "Energy Crisis / Power Problem / Load Shedding in Karnataka"
No responses found. Be the first to respond...
Feedbacks
Post Comment:
behavioral targeting
Notify me by email when others post comments to this article.
Do not include your name, "with regards" etc in the comment. Write detailed comment, relevant to the topic.
No HTML formatting and links to other web sites are allowed.
This is a strictly moderated site. Absolutely no spam allowed.
Name:
Sign In
to fill automatically.
Email:
(Will not be published, but
required
to validate comment)
Type the numbers and letters shown on the left.
Next Resource:
Timings of some trains between Mysore and Bangalore
Previous Resource:
How to use HTML Tags while writing articles for Karnatakaspider.com
Return to Resources
Post New Resource
Category:
Others
Post resources and
earn money
!
More Resources
Energy saving Tips in Home/Office
Collection of Kannada Proverbs
Metro Cash & Carry India, Yeshwanthpur Bangalore
General & Electrical Safety and Prevention of Accidents
Right To Information Act - 2005
Simple steps to learn Kannada language
Popular Tags
Tag posting guidelines
Search Tags
Energy Conservation
.
Load Shedding in Karnataka
.
Power Problem in Karnataka
.
How to avoid load shedding
.
behavioral targeting
Subscribe to Email
Get Karnataka Jobs by Email
Forum posts by Email
Karnataka Articles by Email
My Profile
Sign In
Register
AdSense Revenue
Active Members
Today
EKANGI
(4)
Last 7 Days
praveen
(50)
vineeth
(50)
parivallal
(45)
more...
Best Contributors of KSR
Rank: 4
Amaresh
Rank: 5
kavitha
Rank: 6
Ramanathan A R
Rank: 8
Shankar
Rank: 9
M.AKSHAY
Areas
Bagalkot
Bangalore Rural
Bangalore Urban
Belgaum
Bellary
Bidar
Bijapur
Chamrajnagar
Chickmagalur
Chikkaballapur
Chitradurga
Dakshina Kannada
Davangare
Dharward
Gadag
Gulbarga
Hassan
Haveri
Kodagu
Kolar
Koppal
Mandya
Mysore
Raichur
Ramanagar
Ramanagaram
Shimoga
Tumkur
Udupi
Uttara Kannada
About Us
Contact Us
Copyright
Privacy Policy
Terms Of Use
Revenue Sharing sites
Advertise
Talk to
Tony John
Copyright © SpiderWorks Technologies Pvt Ltd., Kochi, India
2005 - 2012 All Rights Reserved.